Contact Us
Automatic Control Intelligent Agricultral Glass Greenhouse With Shading System
|
Glass greenhouse:
The main purpose of opening windows on the top side of glass greenhouses is to circulate the indoor air, improve the indoor air environment, and also facilitate ventilation and cooling in summer, reduce humidity, etc. The ventilation system is an indispensable part of the greenhouse and plays a very important role in the production of greenhouse important role. The principle of ventilation and cooling refers to the use of natural or mechanical means to make the heat pressure or wind pressure caused by the difference in air density inside and outside the greenhouse to promote the flow of air inside and outside the greenhouse for ventilation, which is beneficial to the hot air in the greenhouse and the outside air. The contact convection accelerates the evaporation of water vapor in the air in the greenhouse and the transpiration of crops in the greenhouse, and then achieves the purpose of cooling under certain parameter conditions.
The top ventilation system of the glass greenhouse adopts rack and pinion and geared motor to open the window, and uses electronic control to control the rack and pinion transmission. Ventilation windows are located on both sides of the roof ridge, and the system is supported by hot-dip galvanized round steel pipes and attached to galvanized steel push-pull rods located in the center of the ventilation windows with special fasteners attached to the ventilation windows. The push-pull rod runs laterally. These push-pull rods are driven by drive shafts, and each row of ventilation windows on both sides of the ridge has a main drive shaft and is connected to the drive motor through a gear and rack mechanism.
Product features
Optional systems
Our advantages
FAQ
1.You are manufacture factory or trading company?
We are manufacture factory. You are welcomed to visit us at any time. In the workshop,it has a complete advanced equipment system for making steel structures and panels. So we can make sure the good quality and also the competitive price.
2.How about your quality control?
Our products have passed CE EN1090 and ISO9001:2008.
3.Can you offer design service?
Yes,we have an engineer team and can design for you according to your requirements.Architectural drawing,structure diagram,processing detail drawing and installation drawing will be made and let you confirm in different time of the project.
4.What's the delivery time?
The delivery time depends on the size and quantity of building.Generally within 30 days after receiving the payment.And partial shipment is allowed for big order.
5.Do you offer service for installation?
We will give you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if need.
6.What's the payment term?
50% deposit and 50% balance before shipment.
7.How to get a quote from you?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype and so on and you will get reply within anytime.
Send your inquiry directly to us